Solid waste landfill in the Adler district of Sochi
Client– CJSC «Safe Technologies»
Head engineer – K. Shadunts
Head structural engineer – M. Marinichev
Within the framework of this project GEOTECH developed solutions of overall geotechnical protection for a solid waste landfill.
Geotechnical protection was made of bored piles d820 mm long, L=21m and 18m, located with a gap of 1070 mm with making of soil anchors in 4 lines of height, set in the plan with a gap of 3210mm. The root of the anchor is embedded in the bedrock at least at 5 m. The geotechnical solution of the landfill is designed as a combined structure with the rigidity created by the combination of the piles d820mm and the reinforced concrete wall 200mm thick. The protection was arranged step by step in accordance with the technology of construction of retaining structures.
Calculations were carried out using the specialized geotechnical software PLAXIS and GEO-SLOPE taking into account the estimated 8-points seismicity of the site.